info@senecacostseg.com Engineered cost segregation for commercial real estate 1 to 4 units or short-term rental? Visit Senecacostseg.com
  • Home
  • Savings Estimator

Commercial Savings Estimator

Enter the property details for a first look at the depreciation an engineered study could accelerate. For a number built for your property, Engineering prepares the estimate.

Property details

Every field is used in the estimate.

Your estimate appears here

Fill in the property details and select Calculate.

How the estimate works

The estimator is adapted from Seneca's savings calculator. It splits the depreciable basis (purchase price less land, plus improvements) into 5-, 7- and 15-year property and the remaining building life using reclassification assumptions for the sub-type you choose. Bonus depreciation is applied at the rate that corresponds to the placed-in-service date you enter, and the building is depreciated on a straight line over its recovery period.

It is a first look, not a study. Your actual result depends on what is in the building, its cost basis, its acquisition and placed-in-service facts, and the law that applies to it. An engineered study is built from the property itself.

Want a number built for your property?

Commercial estimates are prepared by Engineering and held to a deeper investigation. Request a proposal, or if you have not closed yet, request a pre-acquisition estimate.

General information, not tax advice. Confirm treatment with your CPA.

Estimator questions

Still have a question? Ask Engineering.

How accurate is the estimator?

It is a first look based on typical reclassification for the sub-type you choose. An engineered study is built from the property itself, so the real result can differ.

Does the estimator apply bonus depreciation?

Yes, at the rate that matches the placed-in-service date you enter.

How do we get a number for our property?

Request a proposal. Engineering prepares the estimate, and you get a written, fixed-fee proposal within 24 to 48 hours.

Is this tax advice?

No. It is general information. Confirm treatment with your CPA.

Get a Commercial Savings Estimate

Fixed-fee proposal in 24 to 48 hours.

  • Prepared by Engineering
  • Lifetime audit defense
  • NDAs available
info@senecacostseg.com 1210 Jackson St SE, Suite 2, Albany, OR 97322

Request your estimate

Estimates are prepared by our Engineering team.

Request received

Engineering will review the property and send your written estimate and proposal within 24 to 48 hours.
Preview site: this form is not yet connected, so nothing was sent.

Get a Proposal