info@senecacostseg.com Engineered cost segregation for commercial real estate 1 to 4 units or short-term rental? Visit Senecacostseg.com
  • Home
  • Syndicators, Funds & Portfolios

Cost segregation for syndicators and funds

Every property studied the same way, with one coordinator.

How a portfolio program works

  • Every property in one program

    Commercial assets and 5+ unit multifamily, studied under one engagement.

  • A single coordinator

    One person manages every study, your CPA and your timeline.

  • Reports that match

    Each report and schedule is built the same way and signed off by our Head of Engineering.

First-year depreciation for you and your investors

A study in the year you buy puts the deduction on the first return, allocated to partners under your operating agreement.

Multifamily 5+ studies

A multifamily building with retail at street level
Multifamily 5+ and mixed-use

We build the business case with you

We work with you and your CPA on the ROI before you commit.

  • An estimate from Engineering

    Not a sales quote.

  • A fixed fee, in writing

    Within 24 to 48 hours.

  • Your CPA involved

    From estimate to final report.

We follow the IRS audit guide to the line

Every study is built to the IRS Cost Segregation Audit Techniques Guide (CSATG).

  • Built to the CSATG

    Method and documentation follow the guide.

  • Signed off at the top

    By our Head of Engineering.

  • Defended for life

    Lifetime audit defense included.

Portfolio program questions

Still have a question? Ask Engineering.

Can you study properties in different states?

Yes. We work in all 50 states, with Virtual or Onsite Tour options.

Will the reports match across the portfolio?

Yes. Every report and fixed asset schedule is built the same way, to the IRS audit guide, and each is signed off by our Head of Engineering.

Who do we work with day to day?

One coordinator runs the whole program: every study, your CPA and your timeline.

Can you estimate depreciation before we close?

Yes. Pre-acquisition estimates are prepared by Engineering so the depreciation can go into your underwriting before closing.

We own properties that never had a study. Can you catch them up?

Yes. Look-back studies claim the missed depreciation through Form 3115, and we have deep experience delivering these for large look-back portfolios.

Are sensitive deals kept confidential?

NDAs are available for sensitive projects, and documents come in through a secure upload.

Talk to us about a portfolio

Fixed-fee proposal in 24 to 48 hours.

  • Prepared by Engineering
  • Lifetime audit defense
  • NDAs available
info@senecacostseg.com 1210 Jackson St SE, Suite 2, Albany, OR 97322

Request your estimate

Estimates are prepared by our Engineering team.

Request received

Engineering will review the property and send your written estimate and proposal within 24 to 48 hours.
Preview site: this form is not yet connected, so nothing was sent.

Get a Proposal