info@senecacostseg.com Engineered cost segregation for commercial real estate 1 to 4 units or short-term rental? Visit Senecacostseg.com

Fixed Asset & Depreciation Schedule Reviews

Most commercial depreciation schedules carry the same few errors for years: a building on one line, improvements in the wrong life, retired components still depreciating. A review finds them, and we coordinate the fixes with your CPA.

Fixed Asset and Depreciation Schedule Reviews

The same few errors, carried for years

Most commercial schedules were built at closing, by someone without the engineering detail, and then left alone. A review reads them against what the property actually contains.

Common findings and their fixesWhat a review looks for
FindingWhat it costsThe fix
Building carried as a single lineShort-life components stuck in a 27.5- or 39-year lifeLook-back study with Form 3115
Acquisition never studiedMissed acceleration from the year it was placed in serviceLook-back study with Form 3115
Improvements in the wrong lifeQualified improvement property left at 39 yearsReclassification, coordinated with your CPA
Retired components still on the scheduleBasis depreciating for assets that no longer existPartial disposition analysis
Land not separatedDepreciation calculated on basis that includes landCorrection your CPA chooses
How each fix goes on the return is your CPA's decision. We provide the engineering and the supporting detail.

Coordinated with your CPA from the start

Send

The schedules and returns

Your fixed asset and depreciation schedules, prior returns, and the closing statements for the properties on them, through a secure upload.

Review

Read against the property

We identify where a study, a look-back or a disposition would change the result, property by property.

Coordinate

Fixes, with your CPA

Each finding is matched to its fix and worked through with your CPA, who decides how it goes on the return.

Schedule review questions

Still have a question? Ask Engineering.

What do you look for?

Buildings carried as a single line, land not separated, improvements placed in the wrong recovery period, qualified improvement property missed, retired components still on the schedule, and acquisitions that never had a study.

What happens if you find errors?

Each finding is matched to its fix: a look-back study with Form 3115, a partial disposition election, or a correction your CPA chooses. Your CPA decides how it goes on the return.

Do you work with our CPA?

Yes. Reviews are coordinated with the client's CPA from the start.

Is a review the same as a study?

No. A review reads the schedules you have and identifies where a study, a look-back or a disposition would change the result. The study is the engineering that follows.

Get a Commercial Savings Estimate

Fixed-fee proposal in 24 to 48 hours.

  • Prepared by Engineering
  • Lifetime audit defense
  • NDAs available
info@senecacostseg.com 1210 Jackson St SE, Suite 2, Albany, OR 97322

Request your estimate

Estimates are prepared by our Engineering team.

Request received

Engineering will review the property and send your written estimate and proposal within 24 to 48 hours.
Preview site: this form is not yet connected, so nothing was sent.

Get a Proposal