info@senecacostseg.com Engineered cost segregation for commercial real estate 1 to 4 units or short-term rental? Visit Senecacostseg.com

Cost Segregation for Recreation Property

Recreation property is built around what visitors use, not around the building that shelters it. Docks and slips, rides and attractions, courts, pools, fitness equipment and the site work that ties them together are distinct assets, and each needs its own analysis before anything goes on the fixed asset schedule.

Building life39-year
Short-life classes5 / 7 / 15-year
Site tourVirtual or onsite
Recreation property

Where the value is in recreation property

Engineering has completed studies for every commercial property type, from hotels to lumber mills.

  • Marinas
  • Amusement facilities
  • Recreation facilities
  • Social clubs
  • Gyms and fitness centers

Waterfront and site improvements

Marinas and outdoor facilities carry docks, piers, bulkheads, paving, parking, fencing, lighting and landscaping. Many of these are land improvements. Some, such as floating dock systems, raise classification questions that depend on how they are built and secured, and the study documents the answer for each.

Attractions and equipment

Rides, attractions, game equipment, fitness equipment and audio-visual systems are generally personal property rather than part of a building. Their recovery periods depend on the asset and the activity it is used in, and Engineering classifies them item by item.

Clubhouses and amenity buildings

Social clubs and recreation centers combine a 39-year shell with kitchens, bars, locker rooms, decorative finishes and specialty lighting. The building stays a building; the equipment and finishes inside it are separated out and documented.

Commonly reclassified components

Representative of what an engineered study identifies in this asset class. Actual components and recovery periods depend on the property and are documented individually in your report.

Docks, piers and wharves15-year
Paving, parking and walkways15-year
Outdoor courts, fields and pools15-year
Fencing, site lighting and signage15-year
Landscaping, irrigation and drainage15-year
Rides and attraction equipment7-year
Fitness and game equipment7-year
Audio-visual and sound systems7-year
Lockers and locker room furnishings7-year

What would a study find on your property?

Send the property details. Engineering prepares the estimate, and you receive a written, fixed-fee proposal within 24 to 48 hours.

Recreation cost segregation questions

Still have a question? Ask Engineering.

Is a marina's dock system part of the land?

No. Land is not depreciable, but docks, piers, bulkheads and the utilities running out to the slips are improvements. Fixed docks and wharves are generally treated as land improvements. Floating dock systems can raise a different question depending on how they are built and secured, and the study documents the reasoning rather than assuming it.

How are rides and attractions treated?

Generally as personal property tied to the amusement activity rather than as part of a building, with the recovery period set by the activity the property is used in. Engineering identifies each ride or attraction and the dedicated power and supports installed for it, and classifies them separately from the buildings around them.

Our social club runs a restaurant and bar. Does that change the study?

It adds to it. Commercial kitchen and bar equipment, refrigeration, decorative lighting and dining room finishes are analyzed separately from the clubhouse shell, and their recovery periods depend on how the club operates.

Do you study gyms on their own?

Yes. Gyms and fitness centers have their own page covering equipment, specialty flooring, locker rooms and leased-space build-outs: gyms and fitness centers.

Get a Commercial Savings Estimate

Fixed-fee proposal in 24 to 48 hours.

  • Prepared by Engineering
  • Lifetime audit defense
  • NDAs available
info@senecacostseg.com 1210 Jackson St SE, Suite 2, Albany, OR 97322

Request your estimate

Estimates are prepared by our Engineering team.

Request received

Engineering will review the property and send your written estimate and proposal within 24 to 48 hours.
Preview site: this form is not yet connected, so nothing was sent.

Get a Proposal