info@senecacostseg.com Engineered cost segregation for commercial real estate 1 to 4 units or short-term rental? Visit Senecacostseg.com

Cost Segregation for Office Buildings & Office Condos

Office buildings hide most of their short-life value in the build-out. Tenant improvements, low-voltage cabling, decorative lighting and supplemental cooling are routinely capitalized into the 39-year shell, when much of it belongs in 5- and 15-year lives.

Building life39-year
Short-life classes5 / 7 / 15-year
Site tourVirtual or onsite
Office property

Where the value is in office property

Offices are among the asset types where our engineering team has deep experience.

  • Office buildings
  • Office condos

Tenant improvements are the lever

Every re-tenanting adds carpet, ceilings, millwork, glazed partitions and finishes. Interior, non-structural improvements made after the building was placed in service are generally qualified improvement property, which is 15-year and bonus eligible, and the personal property inside them is generally 5-year.

Technology infrastructure is personal property

Structured data and communications cabling, security and access control, AV systems, and the dedicated power and supplemental cooling serving a server or IDF room are tied to the equipment they serve rather than to the building.

Office condos are interior-heavy

An office condo owner holds the unit and an interest in the common elements, so the study concentrates on the interior build-out, finishes and dedicated systems. Office buildings add surface parking, site lighting and landscaping as 15-year land improvements.

Commonly reclassified components

Representative of what an engineered study identifies in this asset class. Actual components and recovery periods depend on the property and are documented individually in your report.

Carpet, vinyl and specialty flooring5-year
Decorative and accent lighting5-year
Data, communications and security cabling5-year
Supplemental HVAC serving server and IDF rooms5-year
Break room appliances and casework5-year
Moveable partitions and window treatments5-year
Modular systems furniture and its wiring7-year
Parking lot paving, striping and curbing15-year
Site lighting, signage and landscaping15-year
Storm drainage and site utilities15-year

What would a study find on your property?

Send the property details. Engineering prepares the estimate, and you receive a written, fixed-fee proposal within 24 to 48 hours.

Office cost segregation questions

Still have a question? Ask Engineering.

Does a multi-tenant office building work better than single-tenant?

Multi-tenant buildings usually carry more build-out per square foot: more demising walls, more finishes, more separate electrical and data runs. Single-tenant buildings still work well, particularly when the tenant is technology, medical or lab-adjacent.

We paid a tenant improvement allowance. Whose deduction is it?

It depends on who owns the improvements under the lease and who bore the economic burden. If the landlord funds and owns the improvements, the landlord depreciates them, and that is the population a study segregates. We review the lease language as part of the engagement.

Is qualified improvement property worth identifying separately?

Yes. QIP carries a 15-year recovery period and is bonus eligible, so correctly identifying it moves a large block of interior spend out of a 39-year life even when it is not 5-year personal property. See renovations and tenant improvements.

Can I study an office condo I own?

Yes. The study covers your unit's build-out, finishes and dedicated systems, along with your share of any common-element costs that are part of your basis. A medical office condo follows the same approach with more dedicated plumbing and equipment power.

Get a Commercial Savings Estimate

Fixed-fee proposal in 24 to 48 hours.

  • Prepared by Engineering
  • Lifetime audit defense
  • NDAs available
info@senecacostseg.com 1210 Jackson St SE, Suite 2, Albany, OR 97322

Request your estimate

Estimates are prepared by our Engineering team.

Request received

Engineering will review the property and send your written estimate and proposal within 24 to 48 hours.
Preview site: this form is not yet connected, so nothing was sent.

Get a Proposal